37.
  • Caption: P42DC 104 is one of the two locomotives regularly assigned to the Downeaster. On October 9-13, the Downeaster's two mid-day roundtrips were bustituted while track work was done between Plaistow, NH and Exeter, NH. The two trainsets spent the day idling on the Valley track next to Boston Engine Terminal. (October 9, 2006)